Skip to main content
GALLERYPUBLIC PRODUCT PROOF

Review realistic BuildBid outputs before you sign up.

These anonymized examples show the shape of the estimate: source-backed line items, confidence signals, review flags, processing time, and the costs your estimator can inspect.

FEATURED SAMPLE

Creek Park Sanitary Sewer

Open the full sample estimate to inspect a review-ready output without creating an account.

Open sample estimate
SiteworkUtilitiesConcreteRestoration

Creek Park Sanitary Sewer

Sitework and utilities

TOTAL

$1,571,679

Public infrastructure package with mainline sewer, laterals, manholes, testing, traffic control, and restoration scope.

FILES

1 PDF - 32 sheets - 14 MB

TIME

2 min 47 sec

LINES

184

FLAGS

7

SOURCE-LINKED LINE ITEMS

CodeDescriptionQtyTotalConf.
33.318 inch DIP sanitary sewer, 6-8 ft depthC-402, keynote 121,380 LF$99,36093%
33.3948 inch precast concrete manholeC-501, detail 4478 VF$148,18093%
31.23Select granular backfillSpec 31 23 335,200 TN$93,60088%
33.01CCTV inspection and testingSpec 33 01 307,826 LF$13,69695%
184 reviewable line items with source linksOpen reviewable sample
DrywallElectricalHVACPlumbing

Medical Office Buildout

Commercial interior

TOTAL

$486,240

Tenant improvement package with partitions, doors, power, HVAC distribution, plumbing rough-in, and finish allowances.

FILES

3 PDFs - 74 sheets - 41 MB

TIME

4 min 12 sec

LINES

126

FLAGS

5

SOURCE-LINKED LINE ITEMS

CodeDescriptionQtyTotalConf.
09.295/8 inch type X gypsum board assembliesA-601 wall types18,420 SF$86,57491%
26.51LED exam room fixtures and controlsE-201 lighting plan94 EA$42,30089%
23.31Low-pressure ductworkM-301 duct schedule4,860 LB$63,18087%
Flagged 5 scope gaps before handoffOpen reviewable sample
MechanicalElectricalPlumbingFinishes

Restaurant Kitchen Renovation

Food service

TOTAL

$312,950

Back-of-house renovation with exhaust hood coordination, grease waste, electrical upgrades, tile, millwork, and night-work notes.

FILES

2 PDFs - 29 sheets - 18 MB

TIME

3 min 35 sec

LINES

89

FLAGS

6

SOURCE-LINKED LINE ITEMS

CodeDescriptionQtyTotalConf.
23.38Type I kitchen hood and exhaust fanM-502 hood schedule1 LS$48,50084%
22.13Grease waste piping and interceptor tie-inP-101 keynote 71 LS$36,80082%
09.30Quarry tile floor and baseA-801 finish plan1,980 SF$31,68092%
Caught exhaust and grease interceptor alternatesOpen reviewable sample
ConcreteSteelRoofingSitework

Warehouse Shell

Industrial

TOTAL

$2,874,500

Pre-engineered warehouse shell with slab, steel, metal roof, dock equipment, site paving, storm drainage, and allowance tracking.

FILES

4 PDFs - 96 sheets - 58 MB

TIME

5 min 18 sec

LINES

211

FLAGS

9

SOURCE-LINKED LINE ITEMS

CodeDescriptionQtyTotalConf.
03.306 inch slab-on-grade with vapor barrierS-101 slab plan45,000 SF$382,50094%
13.34Pre-engineered metal building frameS-501 PEMB notes1 LS$910,00086%
32.12Heavy-duty asphalt pavingC-201 paving plan62,400 SF$343,20090%
Grouped alternates and allowances for reviewOpen reviewable sample
NEXT STEP

Run one of your own old bids.

Use a project where you already know the answer and compare BuildBid's draft against your final bid.

Upload plans