← Back
BuildBidBuildBid
Enterprise Demo

Tractor Supply - Dahlonega

$436,858
Qty: 82%Price: 88%Scope: 75%
AI Confidence: 85%
3 unresolved flags must be cleared before export
0 of 19 items verified — Export locked until all reviewed0%

Blueprint View

CONSTRUCTION PLAN — SHEET C-3SCALE: 1" = 40'N

3 items require review before export

DescriptionQtyUnitUnit PriceTotalConfidenceFlagsVerify
Site Clearing & Grubbing
6AC$4,500.00$27,000
92%
Unclassified Excavation & Fill
3,200CY$14.00$44,800
82%
Silt Fence — Type A (ESPC)
2,400LF$2.75$6,600
90%
24" Curb & Gutter (3000 PSI)Top 3 — Initials Required
2,258LF$21.50$48,547
96%
DOT 30" Curb & Gutter
76LF$27.00$2,052
94%
Concrete Flume at Outfall
1EA$8,294.00$8,294
95%
4" Concrete Sidewalk (3000 PSI)Review Required
3,840SF$6.25$24,000
68%
NIC Risk
8" Aggregate Base Course (GDOT 815)Top 3 — Initials Required
4,800SY$16.50$79,200
84%
2" Type B Asphalt (Intermediate Course)Top 3 — Initials Required
4,800SY$13.25$63,600
83%
1.5" Type F Asphalt (Surface Course)
4,800SY$9.50$45,600
85%
Parking Lot Striping & Signage
1LS$5,800.00$5,800
90%
15" RCP Storm Drainage Pipe
340LF$44.00$14,960
79%
24" CMP Storm Outfall Pipe
180LF$58.00$10,440
87%
Curb Inlets (Type C Grate)
15EA$175.00$2,625
96%
8" PVC Water Main (C-900)
280LF$42.00$11,760
78%
Fire Hydrant AssemblyReview Required
2EA$4,200.00$8,400
72%
Low Confidence
8" PVC Sanitary Sewer (SDR-35)
260LF$48.00$12,480
80%
48" Precast Sanitary Manhole
3EA$3,400.00$10,200
80%
Topsoil, Seed & Erosion Control Blanket
2.5AC$4,200.00$10,500
85%